Display an installation requiring approval for the first time due to a change in the law


If you are erecting or have erected an installation that requires a permit and this installation has not yet been approved or registered, you must report this to the responsible authority in good time.

Coal-fired power plants, industrial plants, intensive livestock farming and similar facilities cause air pollution, noise, vibrations, etc. to a particularly high degree.

In order to protect people and the environment from harmful environmental impacts and to prevent the occurrence of harmful environmental impacts, such plants require a permit for construction and operation in accordance with the Federal Immission Control Act (BImSchG). The installations that require a permit due to their type and size are listed exhaustively in the Ordinance on Installations Requiring a Permit (4th BIm-SchV).

An installation that does not require a permit and has already been erected or the erection or substantial modification of which has begun, becomes subject to a permit when it is included in the list of installations requiring a permit in the Ordinance (4th BImSchV). In this case, the plant is subject to the approval requirements under immission control law and must be registered with the competent authority within three months of the respective 4th Federal Immission Control Ordinance coming into force.

Requirements

  • This is a notification obligation. As the operator of the installation, you comply with this obligation if you submit the notification to the competent authority by the deadline.
  • If the required documents are not already submitted with the notification, you can submit them to the competent authority within a further two months.

What documents do I need?

  • ELiA forms
    • (Electronic immission control application), available on the website of the Trade Supervisory Authority of the State of Bremen
  • Required drawings, plans or expert opinions
  • Explanatory notes on the system
  • Other documents
    • If necessary, ask the competent authority