Show commencement of use of an installation requiring planning permission or without planning permission
If you, as the client, wish to use a building that does not require a building permit, you must notify the building supervisory authority at least two weeks in advance.
-
Basic information
If you, as the client, wish to use a building that is not exempt from procedures, you must notify the responsible lower building supervisory authority at least two weeks in advance.
For buildings in building class 4, with the exception of special buildings as well as medium-sized and large garages, you must also submit the "Confirmation that the construction complies with the fire protection certificate" with the notification of commencement of use.
Requirements
A building may only be used when it itself, access roads, water supply and sewage disposal systems and communal facilities are safe to use to the extent required,
Fireplaces or other fixed firing installations may only be put into operation once the authorized district chimney sweep has checked and certified their safe usability and the suitability and safe usability of the associated exhaust gas systems or ventilation systems into which exhaust gases are discharged. Combustion engines and combined heat and power plants may only be put into operation once he or she has certified the suitability and safe usability of the pipes for the discharge of combustion gases. This also applies to any significant modification of installations.
-
Procedure
Check whether a notification of commencement of use is required for your building. If a notification of commencement of use is required:
- Compile the necessary information and evidence.
- Send the notification to the responsible lower building supervisory authority.
More information
Fireplaces may only be put into operation once the authorized district chimney sweep has certified the suitability and safe usability of the flue gas systems.
Ask your designer (usually an architect or civil engineer) which certificates are required for your specific project.
-
Necessary Documents
- Display of usage recording
- Confirmation that the construction complies with the fire protection certificate (only for buildings in building class 4, excluding special buildings and medium-sized and large garages)
- Fire protection certificate (if not tested by the building authorities; only for buildings in building class 4, with the exception of special buildings and medium-sized and large garages with periodic building authority testing)
-
Competent Department
-
Die Senatorin für Bau, Mobilität und Stadtentwicklung | Abteilung 6 Stadtplanung/Bauordnung (Bremen Stadt)
- +49 421 361 0
- Contrescarpe 72, 28195 Bremen
- Website
- office
@bau. bremen. de
-
Die Senatorin für Bau, Mobilität und Stadtentwicklung I Stadtplanung, Bauordnung Nord (Bauamt Bremen-Nord)
- +49 421 361-18666
- Gerhard-Rohlfs-Straße 62, 28757 Bremen
- Website
- bbn.
office @bau. bremen. de
-
-
Forms
-
Fees / Costs
gebührenfrei
-
Deadlines & processing time
What deadlines must be paid attention to?
The commencement of use must be notified at least 2 weeks before the commencement of use.
How long does it take to process
Not specified
This page has been automatically translated by DeepL. We cannot guarantee that the translation is correct.
The official information in German is complete and correct. 21.07.2025