Display removal of an installation without a permit
-
Bauen und Immobilien
-
Anlagen, Waren und Stoffe
If you intend to remove an installation that requires planning permission or does not require planning permission, you must notify the lower building supervisory authority at least one month in advance.
Basic information
You must notify the lower building supervisory authority at least one month in advance of the removal of installations that require a building permit or do not require a building permit. If the lower building supervisory authority does not take any building supervisory measures, you can start the removal work after the expiry of the one-month period without further approval.
If the structure to be removed is attached to structures that require a building permit or do not require a building permit, the stability of these structures must be assessed by a qualified structural engineer and verified to the required extent. If necessary, the removal work must be supervised by the qualified structural engineer.
The obligation to notify does not apply to
a) installations not subject to procedures pursuant to Section 61 (1) of the Bremen State Building Code,
b) free-standing buildings of building classes 1 and 3,
c) other installations that are not buildings with a height of up to 10 meters.
These may be removed without a notice of removal.
For the removal of the following structures, you need a building permit in accordance with § 64 of the Bremen State Building Regulations:
a) protected cultural monuments that are entered in the list of monuments or buildings that are located in their vicinity,
b) for the partial removal of a building project that is to be classified as a change to a building structure or
c) if the lower building supervisory authority requires a building permit procedure after examining the notification of removal.
Requirements
None.